5.60 |
Kyle says, "not a bad run, a few logs to power over, a few sweepers to drag over and an old bridge to drag around just past the new highway bridge under construction. Not as thrilling as we would have thought from the topo info. The current and grade are pretty constant. At this level there was plenty of water, once the streams merge there were some nice little wave trains, nothing more than 3 feet. A nice little ledge under the bridge where rte. 8 crosses, but no monster drops or huge waves that we hoped for." |